Bruce Highway Overtaking Lanes, Gin Gin

Construction of over 5km of overtaking lanes on the Bruce Highway between Duingal and Wallaville. Scope includes 40,000m3 of bulk earthworks, large jacked and laid stormwater drainage (up to 2700’s), pavements (120kT of roadbase), guardrail, lighting, asphalt and spray seal. Working in a brownfield environment under complex traffic arrangements.

Federal Drive Flood Damaged Site

Reconstruction of 640m of Federal Drive in Federal, Northern NSW. The works were carried out to restore a section of road that was cut off and closed during the 2022 floods. Works took place over 12 months and involved the removal of 5000m3 of landslip debris, stabilising the existing landslide area using 5km of grout […]

Kuranda Range ITS

Installation of Intelligent Transport Systems (ITS) infrastructure and equipment on the Kuranda Range Road (Kennedy Highway 32A). Installation of 2km of electrical and communications conduit via under bore and over 4km of conduit install via trencher through rock. The Project also consisted of install VSLS, CCTV and weather stations on the range which required the […]

Bunnings Hervey Bay

Construction of the new Bunnings Warehouse in Hervey Bay. Works included stormwater drainage, construction of the car parks and building pad. Works also included construction of the deceleration lane for the entrance and resurfacing of the intersection under TMR jurisdiction.

Graham Road, Morayfield

Upgrade of Graham Rd between Hargrave St and Lomandra Dr, works included upgrading the Morayfield East State School carpark in a short time frame over school holiday period, 1.2km of drainage upgrades, construction and commissioning of 3 new intersections, approximately 2500m3 of mill & fill asphalt, and line marking with pedestrian safe crossings.

Isis Highway

Construction of two overtaking lanes on the Isis Highway, south of Bundaberg. The works invovled over 9000m3 of earthworks and 20,00 tonnes of gravel widenings and overlays, constructed under traffic. The pavement was cement stabilised and finished with 50mm asphalt.

Maroochy Blvd

Upgrade of Sunshine Coast busiest intersection to compensate for an ever-growing population. Works included reconfiguration of traffic lanes, construction of new turning lanes including granular pavement construction and asphalting, new pedestrian islands and upgrades to cyclist infrustructure, traffic signal and street lighting upgrade, works included the addition of a U-turn facility on Dalton Dr to […]

Bunnings Kingaroy

Construction of the new Bunnings Warehouse in Kingaroy. Works included internal earthworks, stormwater drainage, construction of the car parks and building pad. Works also included construction of the deceleration lane for the entrance and resurfacing of the intersection under TMR jurisdiction.

Morayfield Bus Station

Upgrade of Morayfield Bus Station at Morayfield Shopping Centre, works included demolition and reconstruction of the entire station, drainage upgrade, structural footings, new pavement construction and construction of architectural station all while keeping the existing public transport operational throughout construction.