Kings Christian College Logan Village

This project involved the delivery of a comprehensive road infrastructure upgrade designed to improve safety, traffic flow and overall network performance. Key construction activities included demolition works, bulk earthworks, road widening with subgrade treatment, installation of new medians, traffic signal construction and commissioning, asphalt surfacing, and final landscaping works. Throughout delivery, the project team successfully […]

First Avenue Streetscape

The First Avenue Streetscape Upgrade is a key infrastructure project supporting the continued growth and development of the Maroochydore CBD. The project will deliver a safer, more accessible and vibrant streetscape for residents, visitors and local businesses. Construction deliverables include: Raised pedestrian crossings and scramble crossings Upgraded footpaths and associated services Accessibility improvements throughout the […]

Bloomfield Road Landslip Remediation

This project involves the design and construction of four landslip remediation sites along Bloomfield Road in Bloomfield, Far North Queensland. Construction works include engineered lightweight fill installation, shotcrete, and soil nail stabilisation works to restore stability and resilience along the corridor. Key challenges include delivering works within the Far North Queensland wet season and managing […]

Old North and South Pine Road

This project involved major civil infrastructure upgrades at Old North Road and South Pine Road, including the construction of two new signalised intersections and significant utility and drainage improvements to support increased traffic capacity and long-term network performance. The scope of works included demolition, earthworks, extensive drainage upgrades including new stormwater lines and extensions to […]

King’s Christian College Pimpama

This project involved the construction of a new signalised intersection at the entrance to King’s Christian College on Pimpama Jacobs Well Road, improving safety and traffic efficiency for students, staff, and the surrounding community. Construction works included: Demolition and earthworks Cement treated base pavements Median construction Signal installation and commissioning Asphalt surfacing Landscaping Footpath amendments […]

Bloomfield Road Reconstruction

Following the devastation caused by Cyclone Jasper in 2022, the township of Bloomfield experienced significant flooding, with large sections of the community submerged underwater. The extreme weather event also triggered multiple landslips along Bloomfield Road, severely impacting access to the remote Indigenous community of Wujal Wujal. GRC Civil was engaged to restore a critical section […]

Ferny Grove Development

This project involves the construction of a major culvert structure to facilitate access to the shopping centre and apartment building in Ferny Grove, Brisbane. Works include a 4-cell 3.6m x 3.3m reinforced concrete box culvert with a split-level base slab, constructed over an environmentally sensitive waterway. The project also delivers road widening, pavement works, earthworks, […]

Bruce Highway Overtaking Lanes, Gin Gin

Construction of over 5km of overtaking lanes on the Bruce Highway between Duingal and Wallaville. Scope includes 40,000m3 of bulk earthworks, large jacked and laid stormwater drainage (up to 2700’s), pavements (120kT of roadbase), guardrail, lighting, asphalt and spray seal. Working in a brownfield environment under complex traffic arrangements.

Federal Drive Flood Damaged Site

Reconstruction of 640m of Federal Drive in Federal, Northern NSW. The works were carried out to restore a section of road that was cut off and closed during the 2022 floods. Works took place over 12 months and involved the removal of 5000m3 of landslip debris, stabilising the existing landslide area using 5km of grout […]